Northwest Tennessee Regional Industrial Center


CERTIFIED - 548-acre "certified" shovel-ready industrial park


REGULATORY REQUIREMENTS
- Regulatory requirements met (phase 1 environmental study, wetlands clearance, archaeological clearance, and rare and endangered plant or animal species clearance)

SOILS -
Excellent, well-drained soils to support heavy construction

SLOPE
- Level to slightly sloping (Slope of 1% to 1.25%)

SUBSURFACE ANALYSIS -
Random subsurface analysis performed

Industrial Park Aerial








Transportation

  • U.S. 51, a four-lane corridor connecting I-55 to the Kentucky Interstate system borders the south
  • SR 21 to the East connecting U.S. 51 to the new Interstate 69 (see transportation) to the North
  • 3,000 feet of Canadian National railroad spur line to the West.  There are three additional 2,500-foot ladder tracks available for railcar storage if needed.

Everett-Stewart Airport

Canadian National Rairoad

Port of Cates Landing

I-69 Route


Infrastructure

  • Electric - 161 kv powerline, Substation adjacent to park
  • Natural Gas - High Pressure Steel Main
  • Sewer - 14" main, system capacity 5.0 MGD, excess 2.0 MGD
  • Water - 14" main, system capacity 8.7 MGD, excess 4.0 MGD
  • A Park “Master Plan” and conceptual rendering was developed as a guide for the long-term development of the site.